Site Map
+86-7996790781  office@chemshun.com
You are here: Home » News and Events » Industry News » Installation Method of Bulk Tower Packing

Installation Method of Bulk Tower Packing

Views: 4     Author: Pingxiang Chemshun Ceramics CO.,LTD     Publish Time: 2024-09-14      Origin: Pingxiang Chemshun Ceramics CO.,LTD

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

(I) Safety of lifting device during filling random tower packing:

1. All construction personnel must wear safety helmets when entering the tower, personnel outside the tower and on the ground must wear safety helmets, and personnel on the tower must wear safety belts;

2. Safety devices such as the switch and overload alarm display of the elevator must be kept intact, and an empty load inspection must be carried out before daily use. It can only be used after it is normal to prevent any accidents caused by electrical failures;

3. During the lifting process, it is strictly forbidden to stand within the radius of the hanging basket to prevent accidents.

(II) Safety and fire prevention:

1. Fireworks are strictly prohibited when entering the construction site;

2. Electric welding shall not be used during the installation of packing;

(II) Packing installation method:

1. Install the random packing according to the tower equipment diagram to ensure that the packing installation height and quantity are correct;

2. Put 10 meters of tap water into the tower to buffer the force of the packing falling into the tower bottom.

3. The filling material is naturally piled into the tower;

4. When filling, it should always be poured from a certain height away from the filling layer. People should not stand directly on the filling material to prevent the filling material from being deformed by pressure and uneven density. Wooden boards should be laid on the filling material to disperse the force;

5. After each section of filling material is installed, the upper end of the chemical filling material should be checked to see if it is flat. If there is any unevenness, it should be naturally flattened with wooden strips;

6. During the filling process, other debris, packaging bags, etc. are not allowed to be left in the tower together with the filling material.

Chemshun plastic random packing


Make Business Easier

We offer not only products, but also our after-sales service.
View More >
Leave a Message
​Copyright © Pingxiang Chemshun Ceramics Co., Ltd. All Rights Reserved. Site Map